Water treatment plant České Budějovice

Place of use: Manufacturing plant

Two tons of RAKO SYSTEM jointing materials were used at the Water Treatment Plant in Plav. After 35 years of running, the South Bohemian Water Treatment Plant in Plav was modernised. The sand filter tanks were newly tiled with RAKO ceramic tiles, and the old technology was replaced. The third, completely new stage of cleaning - charcoal filtration - was added. During the renovation, the durable Taurus Granit tiles and RAKO SYSTEM epoxy jointing materials were used. LASSELSBERGER supplied 2 tons of these materials on site! Only materials tested at TZÚS Prague, which passed the tests and had certificates for contact with drinking water, were used for the Water Treatment Plant in Plav.